Tafelbrug Zuidhorn

portfolio-projecten-tafelbrug-zuidhorn-2.jpg We received the assignment for the transportation and installation of the Bridge from the client. The assignment entailed load out, transport and lift the bridge on his abutments. Lesen Sie weiter
Tags
Projecten EN

Railway bridge Pont des Allemands

portfolio-projecten-railway-bridge-pont-des-allemands-6.jpg We received the assignment for the demolition of the Bridge from Franki. The assignment entailed the lifting, transport and placing on quay of the complete old bridge. Lesen Sie weiter
Tags
Projecten EN

Salvaging anchor and anchor chain

portfolio-projecten-bergen-anker-en-ketting-klein.jpg Project Details: Number: OSRT-16106 Client: - Project: Salvaging anchor and anchor chain Year: 2016 Weight: - Site Location: Noordzee(NL) Works Description: On the 13th of July HEBO assisted a ... Lesen Sie weiter
Tags
Projecten EN

Operations at Helideck Europlatform

portfolio-projecten-werkzaamheden-helideck-europlatform-klein.jpg HEBO was asked to assist with operations at a Euro-platform helideck located in the North Sea. The platform had to be blasted and painted. HEBO assisted the company carrying out the painting and blasting operations with transport and equipment on site. Lesen Sie weiter
Tags
Projecten EN

Heavy fuell spill Rotterdam/Vlaardingen

portfolio-projecten-morsing-stookolie-rotterdam-vlaardingen-klein.jpg HEBO received a call concerning a heavy fuel spill. Involved in the spill was a sea going tanker and an inland vessel. An overflow of the tanks as a result of bunkering was the cause of the spill. Lesen Sie weiter
Tags
Projecten EN

Salvage Kamper Kogge

portfolio-projecten-salvage-kamper-kogge-klein.jpg Salvage combination HEBO/ADC/Baars Cipro won the D&C Tender for the salvage, transport, storage and conservation of the Kamper Kogge. As part of a dredging operation on the river IJssel the 15th age Kogge as to be removed on a geological sensible correct way out of the river soil. Lesen Sie weiter
Tags
Projecten EN

Dismantling Windpark Lely

portfolio-projecten-dismantling-windpark-lely-klein.jpg Hebo won the tender for dismantling Windpark Lely. Order: dismantle four offshore windmills, including removal of the single pile foundations, offshore cables and disposal of the free coming materials. Priority: working on a safe way according the approved workplan. Lesen Sie weiter
Tags
Projecten EN

Salvage Badboot

portfolio-projecten-salvage-badboot-klein.jpg On 18 September 2015 at berth 22 of the Antwerp Docks(Kattendijkdok), the swimming pool pontoon of the “Badboot” sunk completely after collapsing. Dimensions of the Badboot: length of 120 meter and deadweight of 2839 ton. The Kattendijkdok area was limited accessible for heavy lifting equipment. Lesen Sie weiter
Tags
Projecten EN

Installation TKM

portfolio-projecten-installation-tkm-klein.jpg Coming years Rijkswaterstaat will refit the Barrages of the river Nederrijn in the Netherlands. Part of the rifit is renewing of all six steel bows on Amerongen, Driel and Hagestein. A temporary steel bow (TKM) as to be placed and tested, before starting the renewing job. Lesen Sie weiter
Tags
Projecten EN

Salvage Barge Scelerate

portfolio-projecten-salvage-barge-scelerate-klein.jpg HEBO received the order for the salvage of the Barge Scelerate. The Scelerate sunk after a collision with a bridge pillar partly under the railway bridge of Temse. We planned our Sheerleg HEBO-Lift 7 for the execution of the salvage. We had to deal with strong currents and swallow waters on the tidal river Schelde. Lesen Sie weiter
Tags
Projecten EN

Trambrug Zwijnaarde

portfolio-projecten-trambrug-zwijnaarde-klein.jpg We received the assignment for the transportation and installation of the Bridge from VBSC. The assignment entailed transporting the bridge in 3 parts from the VBSC quay in Bumar Gent to the working s ite on the canal at Zwijnaarde and placing it them the correct position in between the supporting pylons. Lesen Sie weiter
Tags
Projecten EN

Keersluis Limmel

portfolio-projecten-keersluis-limmel-klein.jpg In an early stage we where involved by the design & construct project Keersluis Limmel. As a part of the tender team we advised Besix and Aelterman for transport and installation solutions. The installation of a bridge(410t) and a retaining wall(200t) was part of a complete make over of the locks of Limmel. Lesen Sie weiter
Tags
Projecten EN

New Heemsteder bridge

portfolio-projecten-heemsteder-bridge-klein.jpg We received the assignment for the loading, transportation and installation of the new build Nieuwe Heemsteder brug from HSM . The bridge was build on the Jetty of HSM at the Wilhe lmina Harbor in Rotterdam. At this location we moved the bridge in its entirety from the the jetty on to the coupled transport barges by using three Sheerlegs. Lesen Sie weiter
Tags
Projecten EN

New Bridges Zeebrugge

portfolio-projecten-bridges-zeebrugge-klein.jpg We received the assignment for the transportation of the two Bridges from Victor Buyck Steel Constructions. The assignment entailed transpor ting the bridge from the quay in Gent to the pre assembly site in Zeebrugge. Lesen Sie weiter
Tags
Projecten EN

New Botlek bridges

portfolio-projecten-new-botlek-birdges-klein.jpg We received the assigment for the transportation of the Bridge from Mammoet Europe/ A - lanes. The assignment entailed transporting the bridge from the Mammoet quay in Schiedam to the newly build Botlek bridge and placing it in the correct position in between the supporting pylons of the Botlek bridge. Lesen Sie weiter
Tags
Projecten EN

Zertifizierung

ISO HEBO MaritiemserviceVCA HEBO MaritiemservicePrestatieladder HEBO Maritiemservice

Social Media

Bleib auf dem Laufenden!

Youtube HEBO MaritiemserviceFacebook HEBO MaritiemserviceTwitter HEBO Maritiemservice

Kontact

Stouweweg 17 – 19
8064 PD  ZWARTSLUIS
Tel +31 (0)38 - 38 68 180
E-Mail info@hebo.eu

Geschäfte: +31 (0)6 - 650 706 63

Scroll to top